|  |  |  |  |  |  |  |  |  |  |  |  |  | 
  
    |  |  |  |  | Projects |  | 
  
    |  |  | 
  
    |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
  
    |  |  |  |  | Hearst 
  Memorial Mining Building, UC Berkeley, California Client: 
        Andre Division, Silvertown UK Limited. Building: 
        Isolation retrofit of an historic building on the University of California 
        at Berkeley campus. System: 
        136 high-damping rubber bearings + 24 viscous dampers. Scope: 
    SIE provided technical support to the isolation bearing manufacturer 
    for the design of the isolation bearings and all aspects of the bearing testing, 
    including development of test protocols, test data analysis and preparation 
    of technical submittals. |  |  |  |  |  |  |  | 
  
    |  |  |  |  |  |  |  |  |  |  |  | 
  
    |  |  |  |  | Cathedral 
  of Our Lady of the Angels, Los Angeles, California Client: 
        Nabih Youssef & Associates; Roman Catholic Archdiocese of Los Angeles. Building: 
        A new 3000+ seat cathedral designed by Jose Rafael Moneo. System: 
        Approx. 200 HDR and slider bearings. Scope: 
    SIE provided technical support to the structural engineer for the preliminary 
    and detailed design of the isolation system, including linear and nonlinear 
    analyses; preparation of the technical aspects of RFP documents; and technical 
    support during bearing production and testing. |  |  |  |  |  |  |  | 
  
    |  |  |  |  |  |  |  |  |  |  |  | 
  
    |  |  |  |  | Public 
  Safety Building, Berkeley, California Client: 
        City of Berkeley, Berkeley, California.  Building: 
        A new 65,000 sq.ft. building housing police, fire, 911 emergency communications, 
        and jail facilities.  System: 
        27 lead-rubber and 5 slider bearings.  Scope: 
    SIE,developed the structural and isolation system design for the design/build 
    procurement. Subsequent activities included structural and isolation design 
    review of the final design and isolation bearing testing inspection.  |  |  |  |  |  |  | 
  
    |  |  |  |  | Isolation 
  Retrofit of the Golden Gate Bridge North Viaduct, San Francisco, California Clients: 
        Signet Testing Laboratories, Golden Gate Bridge Highway and Transportation 
        District. Scope: 
    SIE provided testing inspection services and design review services for lead-rubber 
    isolation bearings for the seismic isolation retrofit of the North Viaduct 
    approach to the Golden Gate Bridge. |  |  |  |  |  | 
  
    |  |  |  |  |  |  |  |  |  | 
  
    |  |  |  |  | Isolation 
  Retrofit of the San Diego-Coronado Bay Bridge, San Diego, California  Client: 
        Forell/Elsesser Engineers, San Francisco, California.  Bridge: 
        An existing 
        1.3-mile viaduct spanning between San Diego and Coronado Island.  System: 
    Approx. 84 isolation 
    bearings + 20 viscous dampers.  Scope: 
    SIE performed a performance assessment review of the elastomeric isolation 
    bearing designs developed by the structural engineer. |  |  |  |  | 
  
    |  |  |  |  |  |  |  |  | 
  
    |  |  |  |  |  |  |  |  | 
  
    |  |  |  |  | Isolation 
  Retrofit of the Los Angeles City Hall, Los Angeles, California  Client: 
        Nabih Youssef & Associates; City of Los Angeles.  Building: 
        An existing 28-story building, approx. 910,000 sq.ft.  Bearings: 
    475 high-damping 
    rubber bearings and 58 slider bearings.  Dampers: 
    52 fluid viscous dampers for the isolation system and 12 fluid viscous dampers 
    for the superstructure.  Scope: 
        SIE provided technical support to the structural engineer for the preliminary 
        and detailed design of the isolation system, including elastomeric and 
        slider bearings and fluid viscous dampers; technical support with linear 
        and nonlinear analyses; preparation of the technical aspects of the RFPs 
        for both the bearings and the dampers; technical support during bearing 
        and damper prototype and production and testing |  |  |  |  | 
  
    |  |  |  |  |  |  |  |  | 
  
    |  |  |  |  | Sacramento 
  River Bridge, Rio Vista, California  
        Client: SOH & Associates, San Francisco, California.  Bridge: 
        Retrofit of a 2900-ft. long steel bridge with 300-ft. lift-span.  System: 
    28 lead-rubber 
    bearings and 8 fluid viscous dampers.  Scope: 
    SIE provided technical support to SOH&A for the nonlinear analysis, design 
    and specification of the isolation system scheme, and for fluid viscous dampers 
    used to control uplift of the lift-span towers. |  |  |  |  | 
  
    |  |  |  |  |  |  |  |  | 
  
    |  |  |  |  | LAC+USC 
  Medical Center Replacement Project Base Isolation, Los Angeles, California  Client: 
        Andre, Silvertown (UK) Limited, Burton-on-Trent, England.  Building: 
    A new 350,000 sq.ft. steel frame Diagnostic and Treatment Building.  System: 
    Approx. 100 high-damping rubber bearings.  Scope: 
        SIE is providing technical support to Andre through all phases of the 
        project, from materials characterization through to prototype and production 
        bearing testing and on-site installation.  |  |  |  | 
  
    |  |  |  |  | Caltrans/CHP 
  Traffic Management Center, San Diego, California  Client: 
        Bridgestone Industrial Rubber Products, (USA), Inc.  Building: 
        A new 2-story, 40,000 sq.ft. steel frame building.  System: 
        40 high-damping rubber bearings.  Scope: 
        SIE provided review and approval of the isolation bearing design, prototype 
        and production test plans, and completed test reports.   |  |  | 
  
    |  |  |  |  |  |  | 
  
    |  |  |  |  | Inchon 
  LNG Receiving Terminal, South Korea  Client: 
    Daelim Industrial Co., Ltd., Seoul, South Korea.  Structures: 
    Three new LNG tanks, each with a storage capacity of 100,000 m3.  System: 
        1176 high-damping rubber bearings (392 per tank).  Scope: 
    SIE provided technical support to Daelim in reviewing the design of the isolators, 
    the results of the reduced-scale prototype tests, and evaluating compliance 
    of the test results with the design specifications. |  |  | 
  
    |  |  |  |  |  |  | 
  
    |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |